In the case of having the b+ product installed in an ECC system that is going to be converted to S/4 HANA, the following must be taken into account.
Before performing the SUM process, both the original .SAR patches of the b+ product and their respective ACPs must be placed in the directory where the patches are uploaded.
Info |
---|
ACPs are files that modify the requirements of the original addon to allow the installation of the addon on the S/4 HANA system. |
In case the ACPs are not included, the SUM process will not allow the conversion and will display an error message indicating this in the corresponding component validation phase.